Our Projects

MAIN CONTRACTOR: MASAH SPECIALIZED CONSTRUCTION COMPANY

PROJECT TITLE: Dr. Sulaiman Al Habib Hospital – SAHAFA ( Riyadh)

SCOPE OF WORK: Installation of BUSWAY rating from 800 amps to 5000 amps.

  • Installation of channel supports which includes threaded rod, Unistrut channel for hanging the BUSWAY.
  • Installation of BUSWAY rating from 800 amps to 5000 amps from Transformer to MDB.
  • Torquing of BUSWAY with rated capacity.
  • Megger Testing of BUSWAY system from end to end.

MAIN CONTRACTOR: MASAH SPECIALIZED CONSTRUCTION COMPANY

PROJECT TITLE: SUPPORT BUILDING PROJECT-AN NABANIYAH

SCOPE OF WORK: LIFT STATION AND PUMP ROOM INSTALLATION WORKS.

 

  • Installation of Lift Station with all the required accessories such as Submersible sewage Pumps, Gate valves, NRV, Float Switch, Black steel pipes Support and accessories.
  • Installation of Pump Room for Portable & Fire with all the required accessories such as Booster Pump(141 GPM, 4.5 Bar) with suction and discharge head Including BV, NRV Strainer, Pressure Vessel, Fire Pump, Jockey Pump, Black steel pipe, Gate Valve, Flow meter, ball valve, swing check valve, Pressure Guage, and all required accessories.

MAIN CONTRACTOR: MASAH SPECIALIZED CONSTRUCTION COMPANY

PROJECT TITLE: SUPPORT BUILDING PROJECT-AN NABANIYAH

SCOPE OF WORK: MEP EXTERNAL WORKS.

 

  • Installation, Testing and commissioning of Transformer of 1000 & 500 KVA, Generator set, MV cable, LV cable, LC cables laying, termination and testing.
  • Street Lighting Pole installation works.
  • Fiber Optic Cable pulling of different sizes and termination and Testing works.
  • Sewage, Storm, Irrigation & Portable Water Pipe line works such as installation, Testing and Commissioning works.
  • Valves Installation of different sizes in PRV chambers, AV chambers & valves Chambers.
  • Fire Hydrants installation works.
  • HDPE pipe, UPVC pipe Installation and testing works.
  • GRP Manholes Installation and Lamination works.
  • Irrigation works including Lateral Line of different sizes and Solenoid Valves, Quick Coupler, Sprinkler, Bubblers, Ground cover for Trees, Grass & Shrubs.

MAIN CONTRACTOR: CHINA PETROLEUM PIPELINE ENG. COMPANY

PROJECT TITLE: Construction of ROW and BERM making pipeline Dia 30” & 36” upto 35 km length – (North Harad GGM)

SCOPE OF WORK:

 

  • Survey for alignment of pipe line ranging from (30” to 36”)
  • Removal of vegetation and primary marking for Excavation
  • Preparation of access road and Right of Way
  • Backfilling of Marl material
  • Berm construction
  • Finishing work for Right of Way
  • Preparation of structural pad for foundation

MAIN CONTRACTOR: K.A KHONAINI & PARTNERS CONT CO LTD

PROJECT TITLE: POWER BOOSTER PROJECT

SCOPE OF WORK:

 

  • Installation of Rectifier Transformer 3 MVA rating on transformer pad with all required grounding works.
  • Installation of Heat Exchanger with all its piping assemblies
  • Termination of MV cable rating 33 KV.
  • Testing and commissioning of Transformer (3 MVA), Rectifier and Heat Exchanger and their Cable.

MAIN CONTRACTOR: ADVANCE WATER TECHNOLOGY/SETE ENERGY/RAWAFID INSDUSTRIAL/AL FATAH CONSORTIUM

PROJECT TITLE: SATELLITE DESALINATION PLANTS ALONG WEST COAST OF SAUDI ARABIA

SCOPE OF WORK:

 

Oil Filling, Filtration and Oil Testing of Transformer Oil (BDV) of 12.5 MVA 33/6.9 KV & 3.15 KVA 6.6/0.4 KV.

MAIN CONTRACTOR: SINOPEC / YESMU

PROJECT TITLE: YANBU – MADINA PHASE 3 WATER TRANSMISSION WORKS

SCOPE OF WORK:

  • Installation of 36” cable Tray with all required supports and accessories.
  • Laying of 1C x 400 mm2 8.75/15KVCU/XLPE/UNARMOURED/HDPE Cables around 40,000 meters from Is Limiter Panel(ABB) to 13.8 KV Switchgear Panl
  • Laying of 1C x 240 mm2 8.75/15KVCU/XLPE/ARMOURED/HDPE Cables around 9,000 meters from 13.8 KV Switchgear Panels (ABB).
  • Laying of 72 fiber and 8 Fiber Cables around 5,000 meters.
  • Laying & Termination of Control and Low Voltage Multi core cables.
  • Termination of MV cables and Fiber Optic Cables.
  • Testing of MV Cables (Hipot & Insulation Resistance Test).
  • Testing of Fiber Optic Cables ( OTDR & Power Meter).
  • Excavation of Trench and Duct Bank Casting & Installation at road crossings.

MAIN CONTRACTOR: AZMEEL CONTRACTING COMPANY

PROJECT TITLE: Construction of ROW and BERM making pipeline Dia 56” upto 140 km length – (KHURAISH)

SCOPE OF WORK:

 

  • Survey for alignment of pipe line ranging from (30” to 36”)
  • Removal of vegetation and primary marking for Excavation
  • Preparation of access road and Right of Way
  • Backfilling of Marl material
  • Berm construction
  • Finishing work for Right of Way
  • Preparation of structural pad for foundation

MAIN CONTRACTOR: INDUSTRIAL INSTRUMENTATION CONTROL SYSTEMS

PROJECT TITLE: ESD UPGRADE PROJECT

SCOPE OF WORK:

  • Installation of 2”, 1 ½” and 1” PVC Coated GRS Conduit to different plant facilities.
  • Pulling of 24F Fiber Optic Cable through PVC Coated RGS Conduit to CCR of different plant facilities.
  • Splicing and Testing of Fiber Optic Cable.

MAIN CONTRACTOR: RAKAN TRADING AND CONTRACTING COMPANY

PROJECT TITLE: P & C OF LABOR CAMP, 021-C09

SCOPE OF WORK:

  • Low Voltage Cable: Excavation, Laying of Cable, Installation of Red tiles, warning tape and back filling.
  • Area Lighting System: Excavation, Laying of Cables and conduits, Installation of Lighting Panels, Installation of Lighting Pole (5m & 9m) with Lamp/Termination works and backfilling as per RC requirements.

 

MAIN CONTRACTOR: RAKAN TRADING AND CONTRACTING COMPANY

PROJECT TITLE: P & C OF LABOR CAMP, 021-C09

SCOPE OF WORK:

 

  • Dismantling of existing old Substations
  • Removal of existing cable and panels and secure material at store area
  • Removal of existing foundation and shift to laydown area
  •  Area leveling and cleaning.

MAIN CONTRACTOR: SETE SAUDIA

PROJECT TITLE: ASP_MR/SUPPLY, TERMINATION AND TESTING OF 3C X300 MM2 15 KV MV CABLES

SCOPE OF WORK:

  • Supply of 3c x 300 mm2 Raychem Termination Kit Indoor Type EPKT –
  • 17D3XIH2 up to 17.5 KV
  • Supply of 3c x 300 m2 Raychem Termination Kit Indole Type – Elbow Type
  • Termination kit up to 17.5 kv
  • Termination works of 3c x 300 mm2 17.5 KV MV cables
  • Testing and Commissioning works for 3c x 300 mm2 mv cable

MAIN CONTRACTOR: SETE SAUDIA

PROJECT TITLE: ASP_MR/SUPPLY, TERMINATION AND TESTING OF 3C X300 MM2 15 KV MV CABLES

SCOPE OF WORK:

  • Supply of 3c x 300 mm2 Raychem Termination Kit Indoor Type EPKT –
  • 17D3XIH2 up to 17.5 KV
  • Supply of 3c x 300 m2 Raychem Termination Kit Indole Type – Elbow Type
  • Termination kit up to 17.5 kv
  • Termination works of 3c x 300 mm2 17.5 KV MV cables
  • Testing and Commissioning works for 3c x 300 mm2 mv cable

MAIN CONTRACTOR: Utilities and Industrial Power Services

PROJECT TITLE: DHAHRAN SOUTH HOME OWNERSHIP/1B 115/13.8 KV SUBSTATION

SCOPE OF WORK:

 

  • Termination works of 3c x 300 mm2 17.5 KV MV cables
  • Testing and Commissioning works for 3c x 300 mm2 mv cable (Hi-pot VLF type)
  • Termination works of 1c x 630 mm2 17.5 kv MV cables
  • Testing and Commissioning works for 1c x 630 mm2 mv cable (hi-pot VLF type)

MAIN CONTRACTOR: YALEEN STEEL FACTORY

PROJECT TITLE: 2.5 MVA TRANSFORMER OIL FILTRATION AND TESTING AT YALEEN STEEL FACTORY – RIYADH – 2 NO’S

SCOPE OF WORK:

 

  • Oil Breakdown prior to filtrations
  • Flushing of Transformer Winding,
  • Oil filling in Transformer
  • Oil circulation in the winding tank.
  • Venting of Transformer
  • Oil Breakdown test and Dissolve Gas Analysis Test.