MAIN CONTRACTOR: GRUPO M AESSA
PROJECT TITLE: P/O TO DHAHRAN SOUTH HOME OWNERSHIP 115/13.8 KV SS 1B.
SCOPE OF WORK:
- GIS Installation works which consists of 10 bays Make: HYUNDAI.
- 50/67 MVA 115/13.8 KV transformers installation, assembling, oil filtration, MV cable pulling and Termination works.
- 8/.048 KV Station Service Transformers Installation and Terminations works.
- 8 KV Switchgear of 53 cubicles Installation, bus bar assembling, MV & LV cable pulling and Termination works.
- Capacitor Bank Installation.
- Control Panel Installation, cable pulling and termination works.
- Substation Lighting and Area lighting works.

MAIN CONTRACTOR: Gulf Consolidated Contractors Co. (GCC)
PROJECT TITLE: Package 8:- Electrical, Instrumentation & FO Installation, Testing & Commissioning.
Package 8 :- HTS Cable Installation.
SCOPE OF WORK:
- Civil, Electrical &Instrumentation Works in Substations and Remote Sites
- FOC from SATORP to KFI port 33,800 meters on Steel Structure.
- FOC & Power Cable from SATORP to Berry Gas Plant 30,000 meters through trenches & Duct banks.
- Heat Tracing Cable HTS Installation for HFO 20 inch, Paraxylene 6-inch, Benzene 8-inch Lines through Cable Tray from SATORP Plant to Port 33,800 Mtrs x 10.
- Heat Tracing Cable Installation for Sulphur 6-inch line from SATORP to Sulphur Scrapper Berry Gas Plant


MAIN CONTRACTOR: Utilities and Industrial Power Services / Al Guhaidan
PROJECT TITLE: Riyadh Refinery Turnaround
SCOPE OF WORK:
- DCS ESD Upgrade ABB to YOKOGAWA in all Process Interface Buildings (PIB’s)/Substations and Control Rooms
- HRSG
- Boilers
- Hydro Cracker
- Sulphur Recovery Unit (SRU)
- Tank Farm
- Hydrogen Plant

MAIN CONTRACTOR: ABB Contracting Co.
PROJECT TITLE: Power Factor Improvement & PMS Installation
SCOPE OF WORK:
13.8 KV Substation Constructions, Resistor Shed and Fiber Optic Ring-Network
MAIN CONTRACTOR: Utilities & Industrial Power Services
PROJECT TITLE: Upgrade of sea water motors
SCOPE OF WORK:
- Electrical, Instrumentation and Mechanical Works
- Up gradation and Installation of Sea Water Motors
- Vibration monitoring system for motors
- Hooking up with Honeywell DCS

MAIN CONTRACTOR: Utilities & Industrial Power Services
PROJECT TITLE: Protection of Gearbox from Catastrophic Failure
SCOPE OF WORK:
- Electrical and Instrumentation Works
- Tapping and Drilling works – Cooling Tower
- Sensors Installation on Cooling Tower
- Power and Control Cabling
- Cable tray & Conduit works around cooling tower
- Hooking up with DCS
MAIN CONTRACTOR: AREVA / Wahabah
PROJECT TITLE: 230KV – 380KV Sub-Station Jubail
SCOPE OF WORK:
- Supply & Installation of Indoor / Outdoor Substation Lighting

MAIN CONTRACTOR: AREVA
PROJECT TITLE: 110KV Sub-Station at STP Jeddah
SCOPE OF WORK:
- GIS Installation works which consists of 10 bays Make: HYUNDAI.
- 50/67 MVA 115/13.8 KV transformers installation, assembling, oil filtration, MV cable pulling and Termination works.
- 8/.048 KV Station Service Transformers Installation and Terminations works.
- 8 KV Switchgear of 53 cubicles Installation, bus bar assembling, MV & LV cable pulling and Termination works.
- Capacitor Bank Installation.
- Control Panel Installation, cable pulling and termination works.
- Substation Lighting and Area lighting works.