MAIN CONTRACTOR: GRUPO M AESSA

PROJECT TITLE: P/O TO DHAHRAN SOUTH HOME OWNERSHIP 115/13.8 KV SS 1B.

SCOPE OF WORK:

 

  • GIS Installation works which consists of 10 bays Make: HYUNDAI.
  • 50/67 MVA 115/13.8 KV transformers installation, assembling, oil filtration, MV cable pulling and Termination works.
  • 8/.048 KV Station Service Transformers Installation and Terminations works.
  • 8 KV Switchgear of 53 cubicles Installation, bus bar assembling, MV & LV cable pulling and Termination works.
  • Capacitor Bank Installation.
  • Control Panel Installation, cable pulling and termination works.
  • Substation Lighting and Area lighting works.

 

MAIN CONTRACTOR: Gulf Consolidated Contractors Co. (GCC)

PROJECT TITLE: Package 8:- Electrical, Instrumentation & FO Installation, Testing & Commissioning.

Package 8 :- HTS Cable Installation.

SCOPE OF WORK:

 

  • Civil, Electrical &Instrumentation Works in Substations and Remote Sites
  • FOC from SATORP to KFI port 33,800 meters on Steel Structure.
  • FOC & Power Cable from SATORP to Berry Gas Plant 30,000 meters through trenches & Duct banks.
  • Heat Tracing Cable HTS Installation for HFO 20 inch, Paraxylene 6-inch, Benzene 8-inch Lines through Cable Tray from SATORP Plant to Port 33,800 Mtrs x 10.
  • Heat Tracing Cable Installation for Sulphur 6-inch line from SATORP to Sulphur Scrapper Berry Gas Plant

MAIN CONTRACTOR: Utilities and Industrial Power Services / Al Guhaidan

PROJECT TITLE: Riyadh Refinery Turnaround

SCOPE OF WORK:

 

  • DCS ESD Upgrade ABB to YOKOGAWA in all Process Interface Buildings (PIB’s)/Substations and Control Rooms
  • HRSG
  • Boilers
  • Hydro Cracker
  • Sulphur Recovery Unit (SRU)
  • Tank Farm
  • Hydrogen Plant

 

MAIN CONTRACTOR: ABB Contracting Co.

PROJECT TITLE: Power Factor Improvement & PMS Installation

SCOPE OF WORK:

 

13.8 KV Substation Constructions, Resistor Shed and Fiber Optic Ring-Network

MAIN CONTRACTOR: Utilities & Industrial Power Services

PROJECT TITLE: Upgrade of sea water motors

SCOPE OF WORK:

 

  • Electrical, Instrumentation and Mechanical Works
  • Up gradation and Installation of Sea Water Motors
  • Vibration monitoring system for motors
  • Hooking up with Honeywell DCS

MAIN CONTRACTOR: Utilities & Industrial Power Services

PROJECT TITLE: Protection of Gearbox from Catastrophic Failure

SCOPE OF WORK:

 

  • Electrical and Instrumentation Works
  • Tapping and Drilling works – Cooling Tower
  • Sensors Installation on Cooling Tower
  • Power and Control Cabling
  • Cable tray & Conduit works around cooling tower
  • Hooking up with DCS

MAIN CONTRACTOR: AREVA / Wahabah

PROJECT TITLE: 230KV – 380KV Sub-Station Jubail

SCOPE OF WORK:

  • Supply & Installation of Indoor / Outdoor Substation Lighting

MAIN CONTRACTOR: AREVA

PROJECT TITLE: 110KV Sub-Station at STP Jeddah

SCOPE OF WORK:

 

  • GIS Installation works which consists of 10 bays Make: HYUNDAI.
  • 50/67 MVA 115/13.8 KV transformers installation, assembling, oil filtration, MV cable pulling and Termination works.
  • 8/.048 KV Station Service Transformers Installation and Terminations works.
  • 8 KV Switchgear of 53 cubicles Installation, bus bar assembling, MV & LV cable pulling and Termination works.
  • Capacitor Bank Installation.
  • Control Panel Installation, cable pulling and termination works.
  • Substation Lighting and Area lighting works.